Justizgebäude an der Mühlenstraße in Düsseldorf (1914), 14 March 1914
The new courthouse on mühlenstraße in düsseldorf, which is being built on the site of the old presidential building. The building will be 120 m long, 50 m deep and 20 m high; the cost is 35,000,000 mk. (1914). Date: 14 March 1914.