Collection / archive: photo collection rijkswaterstaat: metadata: collection / archive: photo collection rijkswaterstaat
report / series: canal section schotdeuren-gorinchem
description: swing bridge in the gorinchem-vianen road near arkel station. Location south of the bridge near the bridge keeper's house
annotation: the bridge has two passage openings, each wide 14m, length measured in the axis 36. 60m, distance between main girders (also handrails) center to center 5. 32m, width between the main girders (also handrails) 5m, height of main girders outside in the middle 2. 36m, height of main girders outside at the ends 2. 06m, in the open position, the bridge descended bridge ends, due to their own weight 26. 5 mm, in closed position, loaded with 400 kg per m2, the largest deflection turned out to be 5 mm, the installation height is 7 mm. The bridge is completed by one man in 70-80 seconds. Rotated through 90 degrees and set up in 20 and released in 15 sec. The bridge has been processed, including spindle holder, spindle, tooth ring, cushions, etc. Riveted iron 49635 kg, profile iron 5270 kg, forged iron 1234 kg, forged steel 4271 kg, cast iron 4720 kg, phosphor bronze 90 kg, american wood 24 m3 21600 kg total 86820 kg. The rotating part weighs 83800 kg
date: april 29, 1890
location: gorinchem, gorinchem, south holland, south holland
keywords: dredgers, constructions, swing bridges, hydraulic engineering
photographer: tollens czn. , h. J. / company j. G. Hameter
copyright holder: public domain logo
material type: photo (black/white)
archive inventory number: view access 2. 24. 11
inventory number: 76
component number: 685. Date: 29 April 1890.
Loading...